Scaffolding for restoration of bridge

Middle Chine Bridge - Restoration

Great pleasure in supplying  scaffolding for this lovely historical Bournemouth Landmark Bridge. Safe access scaffolding was supplied for restoration works including sandblasting, welding and painting all carried out to a specific detailed design drawing. All working done with the liaison and approval of Bournemouth Borough Council. The structure was wrapped to prevent toxic materials escaping. Scaffold gantry built to maintain safe pedestrian and vehicle access at all times.

Project Duration: 8 weeks

Installation Time: 2 weeks

Project Details: Restoration of historical Landmark for Bournemouth Council